Skip to main content Scroll Top

Site visit and measurements at 150 kWp PV plan

As part of WP5, the PSM Lab performed a reconnaissance site visit at a 150 kWp PV plant in Akaki, Cyprus (built, operated and maintained by Ecoenergia Cy). The particular park was identified for performing further experiments and field tests to investigate the parameters influencing the level of dc leakage emanating from the PV modules, inverters and dc cables under operational and faulty conditions. The site-visit intended at acquiring valuable information about the PV systems operation and layout as well as performing measurements of the isolation resistance and generated power. The project consortium wants to thank the owner for providing access to the plant.