The developed risk assessment tool provides the probability to have a severe coating defect on buried gas pipelines, under episodes related to direct lightning strikes in the adjacent soil. Severe coating defect on the pipeline does not necessarily mean metal wall fusion and gas leakage as a consequence. The risk assessment tool (in its present form) cannot be used to assess the impact on buried pipelines under the incidence of longitudinal induction (i.e. due to lightning strikes on adjacent power lines). |
|
|||
– Comprehensive modelling for estimating the AC interference impact under both normal operating and fault conditions on 11km, cathodically protected, carbon steel pipeline-piggyback mounted on the umbilical |
|
|||
– Modelling for estimating the AC interference impact under both steady state and fault conditions for ~400km of TAP routing from Kavalla to Albanian borders. [Modelling embraced: a) 38 HV circuits (400kV and 275kV), b) 20kV MV circuits, and c) AC Electrified Traction routings in the nearby vicinity]. – Designing an earthing wire oriented mitigation solution to ensure safety and mechanical integrity of TAP. |
|
|||
– Modelling for estimating the AC interference impact under both steady state and fault conditions caused by a13.8 MW Wind Park, on a 28 km section of DESFA pipeline routing. |
|
|||
Developing and validating a hybrid model for estimating the resistance to earth values of traction’s concrete and steel sleepers sections under a range of operational conditions. |
|
|||
Providing and Evaluating Stray Current Design for Thessaloniki’s New Metro System (9.6 km Underground Line (with twin tunnels, Bored & Cut-and-Cover), 13 stations and a depot area). Developing of Stray Current Monitoring Specifications. |
|
|||
Sizing Storage Requirements for Integrating Helios Solar Power Plant in Cyprus Power System and Energy Market.
|